Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd

Swiss Precision, German Quality, Chinese Intelligent Manufacturing

Manufacturer from China
Verified Supplier
6 Years
Home / Products / Gas Pressure Sintering Furnace /

Light Green And Black Gas Pressure Sintering Furnace With Carbon Steel Furnace Shell

Contact Now
Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Visit Website
City:zhuzhou
Province/State:hunan
Country/Region:china
Contact Person:MsShirley
Contact Now

Light Green And Black Gas Pressure Sintering Furnace With Carbon Steel Furnace Shell

Ask Latest Price
Video Channel
Brand Name :Ruideer
Model Number :100 bar
Certification :CE certificate, GB150, JB4732;ISO
Place of Origin :China
MOQ :1 set
Price :USD 93,000-77,000,000
Payment Terms :L/C, T/T
Supply Ability :7 sets / month
Delivery Time :5-8 months
Packaging Details :Special wooden box
Color :white, gray, black, blue
Power rating :120KVA, 150KVA, 480KVA
Furnace shell :carbon steel
Heating element :graphite, carbon felt
Temp. Control :Three-zone
Forming agent :PEG, Paraffin, rubber
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Light Green And Black Gas Pressure Sintering Furnace With Carbon Steel Furnace Shell

The pressurization process of the machine is carried out at the sintering temperature, so that the binder phase metal and tungsten carbide particles flow into any gaps that may exist, maximally eliminating residual pores and defects inside the product, and thus the strength and service life of the alloy are greatly improved.

Technical parameters:

Sintering space 80-450L
Working temperature 1600℃(maximum working temperature)
1550℃(actual working temperature )

Pumping speed

The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa

(After drying the furnace, under the empty furnace, clean and cold state.)

Leakage rate

≤3Pa/h

(Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test. Average within 3 hours in empty furnace, clean and cold state)

Cooling speed

Empty furnace. The cooling time of cooling temperature from 800℃ down to 100℃ just cost less or equal 3 hours.(water temperature≤28℃, 2bar≤water pressure≤3bar)

Cooling speed

The inner furnace is equipped with rapid cooling fan and cooling water realize rapid cooling.
Heating rod material Graphite
Temperature control mode Three zone temperature control independently
Heating up speed

Empty furnace heating up≤5℃

Heating power

320/480KVA

UPS guarantee time

It can power the indicator lights and control the furnace when the power goes out,the time is more than or equal 80 minutes.
Inquiry Cart 0