Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd

Swiss Precision, German Quality, Chinese Intelligent Manufacturing

Manufacturer from China
Verified Supplier
6 Years
Home / Products / High Temperature Vacuum Furnace /

Phone Monitored High Temperature Vacuum Furnace Vacuum Leakage Rate 3Pa/H

Contact Now
Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Visit Website
City:zhuzhou
Province/State:hunan
Country/Region:china
Contact Person:MsShirley
Contact Now

Phone Monitored High Temperature Vacuum Furnace Vacuum Leakage Rate 3Pa/H

Ask Latest Price
Brand Name :Ruideer
Certification :CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
Place of Origin :Zhuzhou City, Hunan Province,China
MOQ :1 set
Price :250000.00(USD)
Payment Terms :L/C, T/T
Supply Ability :7 sets/month
Delivery Time :100-120 work days
Packaging Details :Special wooden case packing
Model Number :User-defined
Name :High Temperature Vacuum Furnace
Temperature measurement mode :WRe5-26 thermocouple
Control power supply :Single-phase AC210V-250V 50HZ
Design :custom
Vacuum pump :slide valve pump, rotary vane pump,ect
Specifications :RDE-GWL-5518
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Phone Monitored High Temperature Vacuum Furnace Vacuum Leakage Rate 3Pa/H

Technical parameters:

Specifications

RDE-GWL-5518

Effective space(w* h * l)mm

500*500*1800

Max.Temperature

2200℃
Maximum load 1800Kg

Vacuum leakage rate:(Average in cold,empty,dry chamber in 3 hours)

3Pa/h
Extreme vacuum 1.5Pa

MAX working pressure

100KPa

Cooling period(Sintering temperature—100℃)

600min

Temperature control mode

3-zone

Input gas allowed

Ar,N2,He,H2,CH4,Co2

Functions:

vacuum heating,heating flowing gas,Rapid cooling.

Applications: For Non-metal ceramic/Sic carbide

Vacuum pump: backing pump, Roots-type pump(slide valve pump, rotary vane pump, screw pump and so on can be selected for the backing pump, allowing customers to choose world-class brand products)

Power supply: General standard is three phase five wire system AC380V±10% 50HZ.

Control power supply: Single-phase AC210V-250V 50HZ design(Different countries and regions can be designed according to local grid standards)

Temperature measurement mode : WRe5-26 thermocouple

Vacuum high temperature sintering furnace preparation

1. A variety of temperature measurement methods (K, S, B, WRe and other thermocouple, infrared thermometer) or combination of choice;

2. Horizontal furnace, unilateral / bilateral reclaiming method; vertical furnace, up / down material;

3. high temperature metal (molybdenum, tungsten) / graphite material heating system selection, to facilitate the different temperature or material process requirements;

4. Can be equipped with special hydraulic forklift loading and unloading system;

Competitive Advantage:

1. The Insulation box is of good insulation effect, free of volatilization athigh temperature, with long life.It adopts “sandwich structure”and CFC material inside and outside with high strength, will be no deformation afteer many years use.

2. Program has resume-heat-at-breakpoint function, no need to restart the program in case of short time power failure.

3. Convenient and intelligent: The control interface of sintering furnace can be monitored by mobile phone, control and understand the running state of the equipment anytime and anywhere. Fully automatic one-key operation function, realize the supervision of multiple devices by one person, intelligent production, and docking ERP management system.

4. Complete after-sales service system: Provides 7 x 24 hour telephone hotline. Propose solutions within 2 hours after receiving the customer's fault notice. With 15 experienced professional after-sales service staff, not only responsible for the company's product installation and debugging, but also for the need of users to complete the domestic and foreign manufacturers of sintering furnace after-sales and maintenance work.

5. Convenient service: If the customer has the demand may carry on the sintering product test in the Ruideer company site, and the company production site has the hot state pressure condition.

6. Quick installation: The installation can be completed and put into production within 15 days when water, electricity and gas are in place.

Inquiry Cart 0